Back to NBN Cabling & Wiring
Newcastle · Lake Macquarie · Maitland · Hunter

NBN Cabling for New Homes, Renovations and Builders

Homeowners, builders, developers and renovation contractors preparing a new dwelling for the NBN can organise every customer-side pathway, conduit, comms-cabinet and Cat6 outlet before walls and ceilings are closed. Netlink handles the full new home NBN cabling scope across Newcastle, Lake Macquarie, Maitland, Cessnock and the wider Hunter — from the marked-up cabling plan through to a tested, labelled and documented handover pack.

  • Internal conduit + lead-in preparation
  • Structured Cat6 / Cat6A to every planned outlet
  • Central comms cabinet + labelled patch panel
  • Wi-Fi AP, CCTV, intercom and smart-home cabling

Netlink is an independent provider of customer-side telecommunications cabling — not an internet provider, not NBN Co and not an authorised NBN contractor. Final NBN equipment placement and any carrier-side work remain subject to applicable NBN requirements, site conditions and the assigned installation method.

What Netlink installs during rough-in

Every customer-side cabling scope for a new home, planned before the walls close up.

The more of this that's done during frame stage, the less it costs and the cleaner the finish. Every metre of Cat6 pre-pulled during rough-in is a metre you never have to chase through cornice and ceiling void after the plasterer has left.

NBN equipment and pathway planning

Before the frame is closed up, Netlink walks the plans with the builder or owner and marks the lead-in entry point, the internal pathway from the lead-in to the preferred NBN Connection Box (NTD) wall, and the Cat6 route from the NTD to the router position. Documented on the plans so every trade knows what's happening before they get in each other's way.

NBN pre-installation
Proposed PCD and NTD locations

Netlink recommends the Premises Connection Device (PCD) position on the external wall and the preferred internal NBN Connection Box location — usually a service cupboard, garage, study, or under-stairs comms position with 240 V power and reasonable service access. Both positions are documented for the NBN-appointed technician to review on install day.

preferred NBN NTD location
Internal conduit and draw-wire preparation

25 mm PVC draw-conduit installed from the external PCD position through the wall cavity, across the ceiling void and down to the internal NTD wall — with a steel or polyester draw-wire pre-installed end-to-end and marked at both ends. Handles single-storey, two-storey and slab-on-ground homes where a ceiling void isn't available.

NBN internal conduit
NTD-to-router cabling

Cat6 (or Cat6A on runs over 40 m or in commercial fitouts) pre-pulled from the planned NTD wall to the preferred router position, terminated onto keystone wall plates at both ends and cable-tested. The router doesn't have to live in the same room as the NBN Connection Box — where you actually want Wi-Fi in the house is where the router should go.

NTD-to-router cabling
Cat6 and Cat6A data points

Data outlets to bedrooms, home office positions, media rooms, kitchen bench, home theatre and any wall that might one day hold a TV or workstation. Cat6 is the default and comfortably supports gigabit; Cat6A is the step-up for commercial fit-outs, long runs, and future 2.5 GbE / 5 GbE / 10 GbE upgrades.

new build data cabling Newcastle
Central communications cabinet

A dedicated comms position — wall-mounted enclosure or shallow floor rack — sized for the NBN Connection Box, the router, a small PoE switch for cameras and access points, and patch panels for every Cat6 tail in the home. Located near the switchboard with a dedicated 240 V GPO installed by your electrician.

home network prewiring
Wi-Fi access-point positions

Ceiling-mount or wall-mount Wi-Fi access-point positions cabled during frame stage — mid-hallway, upstairs landing, alfresco, garage. A single central router is almost never enough coverage for a two-storey or extended-footprint home; ceiling-mount access points on hardwired Cat6 give steady, roaming coverage without any of the mesh-Wi-Fi backhaul compromises.

NBN-ready home
Home-office, television and gaming outlets

Hardwired Cat6 to the study or dedicated home-office wall, behind wall-mount TV positions (goodbye visible cables), and to the gaming console or PC location. On new builds these outlets cost a fraction of what the same runs cost after plaster and cornice — worth roughing in even if the outlet stays capped for a year.

home network prewiring
CCTV, intercom and smart-home cabling

Cat6 pre-pulled to CCTV camera positions (eaves, gable ends, driveway, back yard), IP video-intercom at the front door and garage door, smart-lock cabling, garage-door controller, ceiling-mount Wi-Fi access points and audio-visual head-end runs to the media room. Cheap now, expensive later.

new home NBN cabling
Cabling for garages, sheds and granny flats

Detached buildings — attached garage with home office above, a granny flat, a rear studio or a workshop shed — need their own Cat6 or fibre link back to the main house comms cabinet. Netlink runs the sub-cable in the trench with the electrician's mains sub-main so it's protected end-to-end, with a small enclosure at the detached end.

NBN cabling for builders
On-site coordination

Coordinating with the builder, the electrician and the security installer.

Cabling touches almost every other trade on a new build. Netlink books the pre-frame walk- through with the builder, agrees the GPO layout with the electrician in writing, and lays the backbone runs for whichever CCTV or intercom installer is engaged separately.

Step 1
Coordination with the builder

Netlink joins the pre-frame walk-through, marks up the plans in pen with the builder, and returns during rough-in — after the frame is up, before plaster fixing. Written cabling notes are added to the build file so anyone joining the job later knows what's where.

Step 2
Coordination with the electrician

The 240 V GPO at the comms cabinet, the GPO at each ceiling-mount Wi-Fi access-point position and the mains sub-main to any detached building are the electrician's scope. Netlink and the sparky agree the layout in writing before either trade breaks ground, so cabling and cabling-adjacent power land in the correct positions.

Step 3
Coordination with the CCTV or security installer

Where an alarm or CCTV installer is engaged separately, Netlink lays the Cat6 backbone runs to the specified camera and detector positions during frame stage. The security installer then terminates and commissions their end after handover — with all the cabling already in place and tested.

Who does what

What Netlink does — and what the provider or NBN-appointed technician does.

New-build NBN is a two-team job: the carrier-side (fibre from the street pit into the property boundary and installation of the NBN Connection Box itself) is delivered by the NBN-appointed technician, and the customer-side (the internal pathway, comms cabinet, outlets and every Cat6 tail in the home) is Netlink's scope.

What Netlink does (customer-side)
  • Plan review, pre-frame walk-through and mark-up
  • PCD / NTD position recommendation documented for the NBN technician
  • Internal conduit, draw-wire and lead-in conduit preparation on the customer-side pathway
  • Cat6 / Cat6A pre-pull to every planned data outlet, Wi-Fi access-point, CCTV and intercom position
  • Central communications cabinet, patch panels and small switching hardware
  • Coordination with the electrician on the 240 V GPO scope
  • Testing, labelling and a written cabling report for handover
What the provider or NBN-appointed technician does (carrier-side)
  • Fibre lead-in from the street pit to the property boundary
  • Physical installation and connection of the NBN Connection Box (NTD)
  • Final NTD placement decision, subject to NBN's applicable requirements, site conditions and the assigned installation method
  • Booking of the FTTP appointment and activation of the service
  • Any modifications to the external NBN network beyond the property boundary
  • Ownership and maintenance of the carrier-side equipment and lead-in

No guarantee on NTD placement. Netlink documents the preferred NBN Connection Box location on the plans and prepares the customer-side pathway, but final NTD placement is determined by the NBN-appointed technician subject to applicable NBN requirements, site conditions and the assigned installation method. Preparation makes the preferred location more likely to be approved — it does not guarantee it.

Handover pack

Testing, labelling and cabling documentation.

Every job finishes with a documented handover — test results, labelled patch panel, outlet-labelling map keyed to the plans, and a marked-up as-built drawing. Handed to the owner and — for builder jobs — added to the operations & maintenance pack.

Cabling report is delivered as a PDF and printed for the site file where preferred.
  • 01Every installed Cat6 or Cat6A run wire-mapped and continuity-tested with a certified cable tester
  • 02Length recorded, keystone-jack punch-downs verified at both ends
  • 03Every outlet labelled with a permanent room / position code that matches the patch panel
  • 04Patch panel labelled and photographed for the handover pack
  • 05Written cabling report handed to the owner and to the builder for the O&M pack
  • 06Fibre runs (where installed) OTDR-tested with a copy of the trace provided
Plan review & quotation process

Three steps from architectural drawing to a marked-up cabling quote.

No high-pressure sales call, no on-site visit until the paperwork is worth it. Send us the plans, review the marked-up proposal and the fixed-price quote, and only then commit.

01
Plan review

Send us the architectural or working drawings (PDF, DWG or DXF) and any hand-drawn markups showing where you'd like TV points, home office, router, cameras and intercoms. Netlink reviews the plans and comes back with a marked-up cabling proposal — usually within a few working days.

02
Quotation

Fixed-price quote against the marked-up plans, itemised by scope — internal conduit, Cat6 outlets, comms cabinet, Wi-Fi access-point cabling, CCTV / intercom runs, and any detached building sub-cables. If a site walk-through is required first it's called out in writing before either party commits.

03
Installation and rough-in

Netlink attends the site during rough-in — after the frame is up, before plaster fixing — and installs the full internal cabling scope in one or two visits. Handover pack (test results, patch panel photo, outlet labelling map, marked-up as-built plan) delivered on completion.

Homeowners
Building or renovating your own home?

Send us the architect's drawings and any hand-drawn markups showing where you'd like the router, TV points, home office and cameras. We'll come back with a marked-up cabling proposal and a fixed-price quote.

Homeowner cabling quote
Builders & project managers
Coordinating a build program?

Send the plans (PDF, DWG or DXF), the cabling specification if you have one, and the target rough-in date. Netlink returns a cabling schedule ready for the contract file and can attend multiple lots on program.

Builder cabling schedule
Get a fixed price

Send the plans — get a marked-up cabling quote.

Attach architectural PDFs, DWG or DXF CAD files, builder specifications (DOCX) or phone photos of hand-drawn markups. Netlink reviews the drawings and returns a marked-up cabling proposal with a fixed-price quote — usually within a few working days.

  • ACMA-registered cabler — customer-side wiring only
  • Fixed price after site assessment
  • Written fault report you can share with your provider
  • Newcastle, Lake Macquarie, Maitland, Cessnock & Hunter
Prefer to call? 1300 890 470

Tap or drop to add plans — up to 8, max 25 MB each

Frequently asked questions

New-home NBN cabling FAQs

When is the best time to book Netlink on a new build?

Ideally at plan-review stage — well before the frame goes up. The pre-frame walk-through only needs an hour on-site, and the cabling installation itself happens once the frame is complete but before plaster is fixed. Booking early means outlets, comms cabinet, GPOs and pathway all get positioned correctly the first time.

Does Netlink install the NBN Connection Box or activate the service?

No. The physical installation and connection of the NBN Connection Box (NTD), the fibre lead-in from the street to the property boundary, and the activation of the internet service are carrier-side scope performed by the NBN-appointed technician and your chosen internet provider. Netlink prepares the customer-side pathway, the internal cabling, the comms cabinet and the data outlets so install day is straightforward.

Can Netlink guarantee NBN will install the NTD where I want it?

No — Netlink documents your preferred NTD location on the plans and provides a written recommendation to the NBN-appointed technician on install day, but the final equipment placement decision remains with NBN and is subject to NBN's applicable requirements, site conditions and the assigned installation method. Preparation makes your preferred location more likely to be approved, but never guaranteed.

What file formats can I send you for the plan review?

Architectural PDFs are the most common. We also accept DWG and DXF CAD files if you have them, DOCX specification schedules from the builder, and phone photos of hand-drawn markups on printed plans. Anything you have — send it through and we'll work with what's there.

Do I need Cat6 or Cat6A?

Cat6 is the default for residential and comfortably supports gigabit Ethernet over the typical runs found in a home. Cat6A is worth stepping up to for runs longer than 40 m, for commercial fit-outs, and for any wall you're likely to fit a 2.5 GbE / 5 GbE / 10 GbE router or switch onto later. On a new home the incremental cost of Cat6A over Cat6 is small — worth discussing at plan review.

How many data outlets should a new home have?

There's no fixed answer, but a useful anchor is: one behind every wall-mount TV position, one to each bedroom, two to the home office, one behind the family living wall, one to the media room head-end, one to the garage, and one to the alfresco. Cat6 to ceiling-mount Wi-Fi access-point positions is on top of that. Netlink will make specific recommendations at plan review.

Can Netlink do the cabling for a granny flat or detached studio?

Yes. Cat6 or single-mode fibre sub-cables from the main comms cabinet out to a detached building — attached garage with home office above, granny flat, rear studio or workshop shed — installed in the same trench as the electrician's mains sub-main. Small enclosure and outlet at the detached end. Discussed at plan review so trench timing lines up with the sparky.

What does the plan review and quotation cost?

The initial plan review is free — send us the drawings and we'll come back with a marked-up cabling proposal and a fixed-price quote you can share with the builder or the client. If a site walk-through is required before quoting, that's called out in writing before either party commits.

Which suburbs does Netlink cover?

Newcastle, Lake Macquarie, Maitland, Cessnock, Port Stephens and the wider Hunter — including suburbs such as Merewether, Cardiff, Charlestown, Warners Bay, Hamilton, New Lambton, Kotara, Adamstown, Broadmeadow, Belmont, Toronto, Rutherford, East Maitland and Thornton. Regional Hunter Valley properties are covered on request.

Do you provide a written report at handover?

Yes. Every job finishes with a handover pack containing the cable-tester results for every installed run, a photograph of the labelled patch panel, an outlet labelling map keyed to the plans, and a marked-up as-built copy of the drawings showing what actually ended up where. Handed to the owner and — for builder jobs — added to the O&M pack.

Ready to prepare your new home for NBN?

ACMA-registered · customer-side cabling · pre-frame walk-through, marked-up cabling plans, Cat6 rough-in and a documented handover pack.